RebuildEnterprise application modernization

Modernize what runs your business, without stopping it.

We move client-server applications and aging Java or .NET systems onto modern architectures on AWS, Azure, Google Cloud or Oracle Cloud. One system at a time, with the business running throughout.

Legacy system APIs Modern services Business keeps running throughout
System by system
no big-bang cutovers
4 paths
rehost, replatform, refactor or rearchitect
Rollback ready
defined before every cutover
4 clouds
AWS, Azure, Google Cloud and Oracle Cloud

Signs it's time to modernize.

Legacy systems rarely fail all at once. They get slower, riskier and more expensive every year.

  • Small changes take months

    A minor fix touches several parts of the system, so every release feels risky.

  • The experts are leaving

    The people who understand the system are retiring, and their skills are hard to hire.

  • New things can't connect

    Modern apps, APIs, data platforms and AI can't plug into the old system.

  • Costs keep rising

    Licenses, hardware and unsupported versions cost more every year, and so do security gaps.

  • Growth hits a ceiling

    Performance drops as users and data grow, and scaling means buying bigger machines.

What's usually happening underneath.

In most environments, the problem isn't a lack of effort. It's a lack of engineering structure that built up over years.

  1. Tightly coupled code

    Boundaries were never defined, so one small change ripples across the system.

  2. Hidden integration dependencies

    Systems rely on databases, files and interfaces with no clear contracts.

  3. Built for day one, not year ten

    The architecture was designed for the first release, not for today's volume.

  4. Unclear ownership

    Documentation, release discipline and module ownership have faded over time.

  5. Fear of change

    Because failures hit daily operations, teams avoid touching the system at all.

The right path for each system.

Modernization isn't one strategy applied everywhere. We choose per system, based on business value, risk and budget.

Rehost

Move the application to the cloud largely as it is.

Fits when speed matters most, such as a data-center exit or expiring hardware.

Replatform

Upgrade the runtime, database or infrastructure with minimal code change.

Fits when the code is sound but the platform underneath is outdated or unsupported.

Refactor

Restructure the code to be cleaner, faster and easier to change.

Fits when the system does the right things but is too hard to maintain.

Rearchitect

Redesign into modular, API-first or cloud-native services.

Fits when the business needs have outgrown what the design can support.

Some systems are best left as they are, or retired. The Blueprint tells you which, and we'll say so.

From where you are, to where you need to be.

The legacy estates we work with most, and where they typically land.

  • Client-server desktop appsBrowser-based applications that work on any device
  • Aging Java platformsCurrent Java on supported runtimes, containers and cloud
  • Legacy .NET FrameworkModern .NET, cross-platform and cloud-ready
  • On-premises databasesManaged cloud databases, migrated with reconciliation

Onto the cloud you choose.

We rehost, replatform and rearchitect onto AWS, Azure, Google Cloud or Oracle Cloud Infrastructure, and set the new environment up with monitoring and tested recovery from day one.

  • AWSAmazon Web Services
  • Microsoft AzureAzure
  • Google CloudGCP
  • Oracle CloudOCI
  • Landing zones

    Accounts, networking and access designed before the first workload moves.

  • Infrastructure as code

    Every environment defined in code, so environments don't depend on manual setup.

  • Security and compliance

    Baselines for identity, encryption, logging and audit from the start.

  • Monitoring and backup

    Observability, alerting and tested recovery for every migrated system.

  • Cost optimization

    Right-sized resources and spend tracking, so cloud spend is tracked and kept in check against the data center it replaced.

How we modernize without disrupting the business.

The riskiest part of modernization is the period when old and new run side by side. We plan that period as carefully as the build.

  1. Short discovery

    Assess

    Inventory, dependencies and AI-assisted code analysis.

    You get a roadmap with the right path, risk and cost for each system.

  2. Before any build

    Plan the transition

    Sequence low-risk systems first and design temporary bridges.

    You get a cutover plan with rollback criteria for every step.

  3. In slices

    Modernize

    Replace one capability at a time while the old system keeps running.

    You get working, tested slices you can review every two weeks.

  4. Per slice

    Cut over safely

    Parallel runs, data reconciliation and a rollback ready to go.

    You get sign-off only when numbers match and users are ready.

  5. Ongoing

    Run and improve

    Monitoring, documentation and continued improvement.

    You get a maintainable system and a team that knows it.

AI that reads legacy code, so people can decide.

Decades of undocumented logic is the hardest part of modernization. AI helps us read it faster. Engineers decide what to keep, change or retire.
  • Map the system

    Trace dependencies between programs, databases and interfaces, including the ones nobody wrote down.

  • Explain the logic

    Turn undocumented code into plain-language descriptions your team can review.

  • Lock in behavior

    Generate tests that capture what the system does today, before anything changes.

  • Speed up the rewrite

    Accelerate repetitive conversion work, with every change reviewed by an engineer.

What we protect while we change things.

Our commitments on every modernization program.

  • Daily operations

    No big-bang switchover. We plan every step so the business keeps running.

  • Your data

    Every migration is reconciled, so the new system's numbers match before the old one is switched off.

  • A way back

    Rollback criteria are agreed before each cutover, not after something goes wrong.

  • Integrations

    Connected systems keep working, through temporary bridges where needed.

  • Knowledge

    What we learn about the old system is documented, so it no longer lives in one person's head.

  • Your team

    Your engineers work alongside ours and own the new system confidently when we're done.

Long-running systems, in good hands.

Continuity is what we're known for.

Seven years as an engineering partner to a leading US health IT company

A dedicated Vanna team inside the client's engineering organization since 2019, across platform engineering, integrations, quality and support. Priorities changed; the core team didn't.

Read the story
“They modernized a legacy application without disrupting business operations. The system became easier to maintain and our release cycles improved.”
Product engineering director

Further reading

Modernizing without breaking: a phased approach to legacy systems Why application modernization fails without an operating model

Three ways to start.

Most programs begin with a Modernization Blueprint, so decisions are based on facts rather than guesses.

The best first step

Modernization Blueprint

We map your systems, dependencies and risks, and recommend a path for each one.

How it works
Fixed scope, about 3 to 4 weeks
Request a blueprint

For multi-system programs

Modernization program

A dedicated team that delivers the roadmap slice by slice, alongside your engineers.

Typical start
Within 2 to 3 weeks of the Blueprint
Plan a program

For systems you need to keep running

Run and modernize

We take over support of the legacy system and modernize it gradually from the inside.

Typical start
After a transition, typically 2 to 6 weeks
Discuss support

Questions IT leaders ask before modernizing.

Do we have to move everything to the cloud?

No. Cloud is often the right target, but not always. The Blueprint weighs cost, risk and your constraints, and some systems are best kept on-premises or left as they are.

Will the business be disrupted?

We avoid big-bang cutovers. New and old systems run side by side, each slice is switched over only after parallel runs, and rollback criteria are agreed in advance.

Our system has no documentation. Can you still work with it?

Yes, that's common. AI-assisted analysis and working sessions with your team help us map what the system actually does, and we document it as we go.

How long does modernization take?

The Modernization Blueprint takes about three to four weeks and gives you a timeline for each phase. A program depends on the number and size of systems. Because we work in slices, you typically see results within the first few months, not at the end.

What happens to our data?

Every migration includes reconciliation, so we prove the new system's numbers match before the old one is switched off. See our data engineering and migration practice for more.

Can you work with our in-house team?

Yes, and we recommend it. Your engineers work alongside ours, so they own the modern system with confidence afterwards.

Can you modernize just one part of the system?

Yes. Starting with one high-value, lower-risk capability is often the best way to prove the approach and build confidence.

Not sure where to start? Start with a Modernization Blueprint.

About three to four weeks, fixed scope, ending with a clear roadmap you can act on.

Book a 30-minute call

Tell us a little about what you're working on. A senior engineer will reply within one business day with times that suit you.

What do you need help with?
NDA available before we discuss details.